Hi, I would sometimes like to run multiple processes of CC5 on the same machine. The reason for that is that I often work with high poly meshes which can take long time to load. In order to save time, I then work on something else. So while one mesh would be loading in the background CC5 process, I would be working on another mesh in a second CC5 process.
At the moment my workaround is to use CC4 and CC5 at the same time.